
|
The new Bulkhead wall is installed prior to demolition to preserve your shoreline. |

|
Then the post are cut below grade and the top rail removed before backfill. |

|
The void is filled with red clay and cured for a good rain or so before topsoil. Notice the tie-in with the existing bulkhead, we look GOOD in your neighborhood. |
This is a shot after the Steel Bulkhead, it is built to last.